EasyManua.ls Logo

Absen AW3.9 - Cable Connections and System Testing; Power and Network Cable Connections; Post-Installation Inspection; Initial Screen Power-On Test

Default Icon
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service hotline400-700-3278
Cable connection
Cable connection
Plug the power and network cables on the left side of the back of the cabinet into the power
socket and network cable socket of the next cabinet. To avoid electric shock, please do not
power on when plugged in
Network cable connection Power cable connection
Load quantity of main power cable and main network cable
product model
1 pc main data cable can take:
1 pc standard main data cable can carry
650,000 points; take the standard
1280*960*150 panel as an example
1 pc standard main
Power cable can take:
220V
1 pc standard main
Power cable can take:
110V
AW2.8500X500
21pcs
20pcs
10pcs
AW2.8750X500
14pcs
13pcs
6pcs
AW3.9500X500
39pcs
23pcs
11pcs
AW3.9750X500
26pcs
16pcs
8pcs
Post-installation inspection
After the cabling between panels, use a multimeter to measure whether there is a short circuit at
the AC input (L/N/PE) and DC output (VCC/GND). If you find a short circuit, please check the
circuit carefully. Make sure the circuits and cables are all right before powering the display and
turning it on. Pay attention to the working voltage range of the panel when turning on the display
to avoid the whole screen burning out due to the wrong working voltage.
Turn on the screen and see the performance
When the screen is powered on, play high-definition content, such as video, text, images, etc.
It is suggested to make sure the resolution of the content consistent with the resolution of the
screen, otherwise the content will be compressed, thus affecting the overall performance.
For software operation, please refer to the software instruction
manual.

Related product manuals