3-30 Machine Maintenance Procedures
Power Switch Board Removal 0
Prerequisite:
Mainboard Removal
1. Find Power Switch Board (A) on Base Assembly. Refer to Figure 3-26.
2. Remove powerboard cable (B) from the cable guides (Figure 3-26).
3. Remove one (1) screw (C) from base assembly (Figure 3-26).
4. Remove power switch board (A) from Base Assembly.
Figure 3-26. Power Switch Board
Power Switch Board Installation 0
1. Put Power Switch Board (A) on Base Assembly. Refer to Figure 3-26.
2. Install and secure one (1) screw (C) to base assembly (Figure 3-26).
3. Secure the powerboard cable (B) to the cable guides on base assembly (Figure 3-26).
4. Install Mainboard.
ID Size Quantity Screw Type
C M2.0*2.0 1