Machine Maintenance Procedures 3-45
3. Starting from the top, remove the clear mylar tape (C) and disconnect the LVDS cable
from the LCD panel connector (D) (Figure 3-43)
.
Figure 3-43. LVDS Cable
LVDS Cable Installation 0
1. Put LVDS cable into the LCD panel connector (D) and secure clear mylar tape (C)
(Figure 3-43).
2. Put yellow tape (B) on the LVDS cable to secure it. Refer to Figure 3-42.
3. Put LVDS cable (A) on the rear of the LCD panel. Refer to Figure 3-41.
4. Install LCD panel.