Machine Maintenance Procedures 3-65
3. Install and secure four (4) screws (A) securing the LCD panel to the LCD cover
(Figure 3-76).
Figure 3-76. LCD Panel
Make sure the LVDS and camera cable is moved away from the device to
avoid damage during installation.
ID Size Torque Quantity Screw Type
A M2.0*2.5-I 2.0±0.2KGF/CM 4