- 25 -
4.2 Disassembly /Assembly
4.2.1 Assembly SOP
Preparation before assemble
1.Clean the room for work
2.Identify the area for material
3.Prepare the implement, equipments, materials as bellow:
1) Press-fixture
2) working table
3) Screw-driver
4) knife*1
5) glove
6) cleaning cloth
7) ESD protection
ite
m
picture Operation Tool Notes
1
Stick the big Al tape to
panel which can protect
the WIRE.
2
Take out the BZL from the
PE bag
3
Assemble the LED BD to
the C/B BD
LED BD
C/B BD