Do you have a question about the AddEnergie CoRe+VBV2 and is the answer not in the manual?
Details regulatory compliance for devices operating in Canada under RSS standards.
Outlines FCC rules and potential interference issues for Class A digital devices in the USA.
Provides brief descriptions of the different CoRe+ models available.
Details output power, connector type, and power supply requirements.
Lists relevant security and safety compliance standards like CSA and UL.
Covers essential installation steps and precautions for safe setup.
Highlights crucial safety instructions for operating the EVSE, especially around children.
Details steps for mounting the EVSE with power cable entry from the bottom.
Instructions for mounting the EVSE with power cable entry from the rear.
Describes the process of mounting the EVSE using an electrical box.
Steps for connecting internal cables and properly sealing the station housing.
Verification steps for status light and greeting message after power is applied.
Procedure for testing card reader, authentication, and protection circuit.
Explains connecting multiple stations and the role of a site controller.
Illustrates a common setup for multiple charging stations sharing a circuit.
| Charging Connector | SAE J1772 |
|---|---|
| Mounting Type | Wall-mounted |
| Charging Levels | Level 2 |
| Charging Standard | SAE J1772 |
| Operating Temperature | -30°C to 50°C |