6.8 Air Flow Fault Test 6-4
6.9 SSOV Proof of Closure Switch 6-4
6.10 Purge Switch Open During 6-5
6.11 Ignition Switch Open During 6-5
6.12 Safety Pressure Relief Valve 6-6
7.7 Condensate Drain Trap 7-4
7.8 Shutting the Boiler Down For An 7-6
7.9 Placing The Boiler Back In 7-6
CONTENTS
Chapter 5 – MODE OF OPERATION 5-1
Indoor/Outdoor Reset Mode
Combination Control System
Chapter 6 – SAFETY DEVICE TESTING PROCEDURES 6-1
Para. Subject Page
6.1 Testing of Safety Devices 6-1
6.2 Low Gas Pressure Fault Test 6-1
6.3 High Gas Pressure Test 6-2
6.4 Low Water Level Fault Test 6-2
6.5 Water Temperature Fault Test 6-2
6.6 Interlock Tests 6-3
6.7 Flame Fault Test 6-3
Purge
Ignition
Test
Chapter 7 – MAINTENANCE REQUIREMENTS 7-1
Para. Subject Page
7.1 Maintenance Schedule 7-1
7.2 Ignitor-Injector 7-1
7.3 Flame Detector 7-2
7.4 Combustion Calibration 7-3
7.5 Safety Device Testing 7-3
7.6 Burner Assembly Inspection 7-3
Extended Period of Time
Service After A Prolonged
Shutdown
Chapter 8 – TROUBLESHOOTING GUIDE 8-1
ii