EasyManua.ls Logo

Aerco Benchmark 3.0LN Series - Page 55

Aerco Benchmark 3.0LN Series
127 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE
7-2
5. Next, loosen and remove the ignitor-injector
from the burner housing using a 1" open-end
wrench.
6. Check the ignitor-injector for evidence of
erosion or carbon build-up. If there is
evidence of substantial erosion or carbon
build-up, the ignitor-injector should be
replaced. If carbon build-up is present, clean
the component using fine emery cloth.
IGNITOR-
INJECTOR
120
BURNER
HOUSING
HOUSING
CENTERLINE
Repeated carbon build-up is an indication
that the combustion settings of the unit
should be checked. Refer to Chapter 4 for
combustion calibration procedures.
7. Prior to reinstalling the ignitor-injector, a high
temperature, conductive, anti-seize com-
pound must be applied to the threads.
NOTE
If a replacement ignitor-injector (part no.
58023) is being installed, a compression
nut containing a built-in ferrule will be
included with the replacement part. If
needed, 3 indexing washers are also
included. These washers may be needed
to properly position the gas injector tube
of the ignitor-injector within the 12angle
shown in Figure 7-2.
DEG.
GAS INJECTOR TUBE
MUST BE WITHIN
THIS RANGE
Figure 7-2
Burner Assembly – Top View
8. Reinstall the ignitor-injector in the burner
housing and torque to 80 to 90 in-lbs.
However, if the burner housing was replaced
just prior to replacing the ignitor-injector,
torque to 180 in-lbs, then loosen and re-
tighten to 80 to 90 in-lbs.
9. Connect the staged ignition assembly to the
gas injector tube of the ignitor-injector by
securing the compression nut to the elbow of
the staged ignition assembly.
10.Reconnect the ignitor-injector cable.
11.Reinstall the side and top panels on the
unit.
Table 7-1 - Maintenance Schedule
PARAGRAPH
ITEM
6 Mos.
12 Mos.
24 Mos.
Labor
Time
7.2
Ignitor-Injector
(58023)
*Inspect
Inspect
Replace
15 mins.
7.3
Flame Detector
(66034)
*Inspect
Inspect
Replace
15 mins.
7.4
Combustion
Calibration
*Check
Check
1 hr.
7.5
Testing of
Safety Devices
See CSD-1
Chart in
Appendix I
20 mins.
7.6
Burner
Inspect
2 hrs.
7.7
Condensate
Drain Traps
*Inspect
Inspect &
Clean
1 hr.
* Only performed after initial 6 month period after initial startup.

Related product manuals