Innovation Water Heaters Installation, Operation & Maintenance Manual
OMM-0078_0L AERCO International, Inc. 100 Oritani Dr. Blauvelt, NY 10913 Page 1 of 206
GF-128 Phone: 800-526-0288 PRI: 11/25/2014
USER MANUAL
Installation, Operation and Maintenance
INNOVATION Series
Gas-Fired Water Heaters
Natural Gas or Propane
Modulating, Condensing
Water Heater Models
Applicable to Serial Number
G-14-2265 and above
This guide applies to the
following Innovation models
Innovation 600
Innovation 800
Innovation 1060
Innovation 1350
Other documents for this
product include:
GF-5030 INN-Recon Gas Supply Guide
GF-5050 INN-Recon Venting Guide
GF-5060 INN-Recon Elect. Power Guide
GF-5080 INN Sizing Guide
Latest Update: 11/25/2014

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Aerco INN600 and is the answer not in the manual?

Aerco INN600 Specifications

General IconGeneral
BrandAerco
ModelINN600
CategoryWater Heater
LanguageEnglish

Summary

Safety Precautions

General Warnings and Cautions

General safety regulations and precautions for installation and operation.

Emergency Shutdown Procedures

Instructions for safely shutting down the unit in an emergency.

Installation Procedures

Site Preparation and Installation Clearances

Guidelines for selecting an installation site and required clearances.

Gas Supply Piping and Regulator Installation

Details on gas supply piping, specifications, and external regulator installation.

AC Electrical Power Wiring

Requirements and procedures for connecting AC electrical power.

Flue Gas Venting and Combustion Air

Guidelines for flue gas venting and providing combustion air.

Operation and Controls

Control Panel Overview and Menus

Overview of the control panel, its indicators, displays, and menu structure.

Unit Start Sequence and Levels

Step-by-step guide for the unit's start sequence and start/stop levels.

Initial Unit Start-Up

Initial Start-Up Requirements Checklist

Prerequisites and steps for performing the initial unit start-up.

Combustion Calibration Tools and Setup

Necessary tools and instrumentation for accurate combustion calibration.

Natural Gas and Propane Combustion Calibration

Detailed procedures for calibrating combustion for Natural Gas and Propane.

Temperature Control Calibration Procedures

Steps for calibrating the unit's temperature control for optimal performance.

Over-Temperature Limit Switch Adjustment

Information on accessing and setting over-temperature limit switches.

Safety Device Testing Procedures

Gas Pressure Fault Testing

Procedures for testing low and high gas pressure fault conditions.

Water Level and Temperature Fault Tests

Steps to simulate and test low water level and high water temperature faults.

Interlock and Flame Fault Testing

Procedures for testing interlock circuits and flame fault conditions.

Routine Maintenance Procedures

Troubleshooting Guide

Water Heater Troubleshooting Table

Detailed table of fault indications, probable causes, and corrective actions.

Water Heater Management (WHM)

Startup, Status and Fault Messages

Fault Messages

List of fault messages, their descriptions, and associated causes.

Combustion Calibration (Korea Only)

Warranty

Related product manuals