EasyManua.ls Logo

AERMEC NRK 0150 A - User Manual

AERMEC NRK 0150 A
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
www.aermec.com
Translation from original
Installation manual
EN
60Hz
REVERSIBLE AIR/WATER HEAT PUMP
Cooling capacity 8.8 ÷ 39.7 ton
Heating capacity 116,866 ÷ 593,235 BTU/h
NRK 0150-0700
21.05 – 5167557_02
Question and Answer IconNeed help?

Do you have a question about the AERMEC NRK 0150 A and is the answer not in the manual?

Summary

General Warnings

Important General Instructions

Key instructions for safe operation and understanding risks associated with the unit.

Precautions Against Residual Risks

Specific safety measures to mitigate potential dangers during operation and maintenance.

Reception

Transport and Handling

Procedures for safe movement and transport of the unit.

Inspection Upon Receipt

Steps to verify product condition and completeness upon delivery.

Lifting

Guidelines and safety points for lifting the unit.

Storage

Placement and Installation Requirements

Guidelines for unit placement and installation conditions.

Dimensions, Lifting Points, and Antivibrant Position Mounts

Position of Hydraulic Connections

Weight Distribution

Minimum Technical Spaces

Hydraulic Connections

Connection Procedures

Detailed steps and recommendations for connecting hydraulic circuits.

Discharging System

Procedures for safely discharging the system, especially in winter.

Anti-Freeze Protection

Methods and precautions for protecting against freezing.

Main Hydraulic Circuits

Electrical Connections

Attention

Safety and qualification requirements for electrical work.

Electrical Data

Tables detailing electrical specifications and requirements.

Electric Power Connection to the Electrical Mains

Procedures for connecting the unit to the main power supply.

Commissioning - Warnings

Start-Up Procedures

Initial steps and checks before starting the unit.

Operations with No Voltage Present

Checks to perform before powering the unit.

Hydraulic Circuit Controls

Verification of hydraulic system components and operation.

Commissioning Steps

Final procedures to put the unit into operation.

Maintenance

General Safety and Precautions

Safety and qualification requirements for maintenance operations.

Residual Risk Precautions

Specific risks and preventive measures during maintenance.

Pressure;Temperature and Electrical Risk Prevention

Measures to prevent risks from pressure, temperature, and electricity.

Specific Maintenance Operations

Procedures for cleaning, inspection, and routine maintenance tasks.

Recommended Periodic Maintenance Interventions

General and Cooling Circuit Maintenance

Routine checks for the unit and cooling circuit.

Compressor and Hydraulic Circuit Checks

Specific checks for compressors and hydraulic systems.

Electrical, Electronic, and Cooling Parts Checks

Maintenance for electrical, electronic, and cooling components.

Summary

General Warnings

Important General Instructions

Key instructions for safe operation and understanding risks associated with the unit.

Precautions Against Residual Risks

Specific safety measures to mitigate potential dangers during operation and maintenance.

Reception

Transport and Handling

Procedures for safe movement and transport of the unit.

Inspection Upon Receipt

Steps to verify product condition and completeness upon delivery.

Lifting

Guidelines and safety points for lifting the unit.

Storage

Placement and Installation Requirements

Guidelines for unit placement and installation conditions.

Dimensions, Lifting Points, and Antivibrant Position Mounts

Position of Hydraulic Connections

Weight Distribution

Minimum Technical Spaces

Hydraulic Connections

Connection Procedures

Detailed steps and recommendations for connecting hydraulic circuits.

Discharging System

Procedures for safely discharging the system, especially in winter.

Anti-Freeze Protection

Methods and precautions for protecting against freezing.

Main Hydraulic Circuits

Electrical Connections

Attention

Safety and qualification requirements for electrical work.

Electrical Data

Tables detailing electrical specifications and requirements.

Electric Power Connection to the Electrical Mains

Procedures for connecting the unit to the main power supply.

Commissioning - Warnings

Start-Up Procedures

Initial steps and checks before starting the unit.

Operations with No Voltage Present

Checks to perform before powering the unit.

Hydraulic Circuit Controls

Verification of hydraulic system components and operation.

Commissioning Steps

Final procedures to put the unit into operation.

Maintenance

General Safety and Precautions

Safety and qualification requirements for maintenance operations.

Residual Risk Precautions

Specific risks and preventive measures during maintenance.

Pressure;Temperature and Electrical Risk Prevention

Measures to prevent risks from pressure, temperature, and electricity.

Specific Maintenance Operations

Procedures for cleaning, inspection, and routine maintenance tasks.

Recommended Periodic Maintenance Interventions

General and Cooling Circuit Maintenance

Routine checks for the unit and cooling circuit.

Compressor and Hydraulic Circuit Checks

Specific checks for compressors and hydraulic systems.

Electrical, Electronic, and Cooling Parts Checks

Maintenance for electrical, electronic, and cooling components.

AERMEC NRK 0150 A Specifications

General IconGeneral
BrandAERMEC
ModelNRK 0150 A
CategoryHeat Pump
LanguageEnglish

Related product manuals