EasyManua.ls Logo

AERMEC NRK 0150 - User Manual

AERMEC NRK 0150
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Reversible Heat Pumps
Air-Water
Outdoor Installation
Axial Fans
Scroll Compressor
High Efficiency

EN
NRK
0150÷0700
INRKIY_15.11_5167555_01

Questions and Answers

Summary

General Warnings and Safety

Preservation of Documentation

Instructions for proper handling and storage of the manual for future reference and user responsibility.

Safety and Installation Standards

Essential safety guidelines and standards to be followed during installation and operation of the unit.

Product Identification

Information on how to identify the unit using packing labels and technical plates.

Unit Receipt and Handling Procedures

Lifting and Machine Handling

Detailed instructions for safe lifting, handling, and transport of the unit, including regulations and precautions.

Selection and Placement of Installation Site

Guidelines for choosing a suitable installation location, considering support, safety distances, and maintenance access.

Hydraulic Connection Positions

NRK Version 00 Connections

Diagrams showing hydraulic connection points for NRK units in Version 00 configuration.

NRK Version 01-08 Connections

Diagrams illustrating hydraulic connection points for NRK units in Version 01-08.

NRK Version P1-P4 Connections

Diagrams detailing hydraulic connection points for NRK units in Version P1-P4 configurations.

NRK Version D 00 Connections

Diagrams showing hydraulic connection points for NRK units in Version D 00 configuration.

NRK Version D 01-08 Connections

Diagrams illustrating hydraulic connection points for NRK units in Version D 01-08.

NRK Combined Version Connections

Hydraulic connection details for specific combined NRK unit versions, like NRK_0200 + 330_HE_D[P1÷P4].

Main Hydraulic Circuit Diagrams and Components

Internal Hydraulic Circuit and Standard Components

Diagram of the internal hydraulic circuit and list of components supplied as standard with the unit.

Recommended External Hydraulic Components

List of optional hydraulic components recommended for installer to provide for system integration.

Water Content and Quality Requirements

Table specifying minimum water content and required water quality parameters for unit operation.

System Loading, Emptying, and Draining

System Emptying Procedures

Step-by-step instructions for safely emptying the unit's system, including precautions.

System Draining and Freezing Prevention

Procedures for draining the system and methods to prevent freezing damage during winter shutdown.

Weight Distribution for Unit Supports

Empty Unit Weight Distribution

Table detailing the weight distribution percentages on supports for empty unit configurations.

Operating Unit Weight Distribution

Table showing weight distribution percentages on supports for units during operation.

Electric Connections and Power Supply

Mandatory Electric Connection Requirements

Essential mandatory requirements for safe and correct electrical connections, including earthing and phase checking.

Electric Power Connection Procedure

Step-by-step guide for connecting the unit to the main electrical power supply, including safety checks.

Electrical Data Specifications

User Interface and Control Keys

Interface Control Key Functions

Description of the function of each key on the user interface panel for unit operation and parameter adjustment.

Unit Start-Up Procedure

Menu Structure and Navigation Guide

User Operating Procedures

Moving Between Menus

Instructions on how to navigate through the unit's menu system using the control panel keys.

Selecting and Modifying Parameters

Steps for selecting and modifying unit parameters, including value adjustment and confirmation.

Unit Control and Commissioning

Preparation and Start-up Procedures

Steps for preparing the unit, performing preliminary checks, and executing the initial start-up sequence.

Hydraulic and Machine Commissioning Checks

Detailed checks for hydraulic circuits, machine operation, cooling circuit, and operational features during commissioning.

Routine Maintenance Procedures

Electrical, Hydraulic, and Cooling Circuit Checks

Yearly checks for electrical systems, hydraulic circuits, and cooling circuits to ensure optimal performance.

Mechanical Checks and Disposal

Mechanical inspections of unit components and guidance on proper unit disposal according to standards.

Troubleshooting Common Issues

Summary

General Warnings and Safety

Preservation of Documentation

Instructions for proper handling and storage of the manual for future reference and user responsibility.

Safety and Installation Standards

Essential safety guidelines and standards to be followed during installation and operation of the unit.

Product Identification

Information on how to identify the unit using packing labels and technical plates.

Unit Receipt and Handling Procedures

Lifting and Machine Handling

Detailed instructions for safe lifting, handling, and transport of the unit, including regulations and precautions.

Selection and Placement of Installation Site

Guidelines for choosing a suitable installation location, considering support, safety distances, and maintenance access.

Hydraulic Connection Positions

NRK Version 00 Connections

Diagrams showing hydraulic connection points for NRK units in Version 00 configuration.

NRK Version 01-08 Connections

Diagrams illustrating hydraulic connection points for NRK units in Version 01-08.

NRK Version P1-P4 Connections

Diagrams detailing hydraulic connection points for NRK units in Version P1-P4 configurations.

NRK Version D 00 Connections

Diagrams showing hydraulic connection points for NRK units in Version D 00 configuration.

NRK Version D 01-08 Connections

Diagrams illustrating hydraulic connection points for NRK units in Version D 01-08.

NRK Combined Version Connections

Hydraulic connection details for specific combined NRK unit versions, like NRK_0200 + 330_HE_D[P1÷P4].

Main Hydraulic Circuit Diagrams and Components

Internal Hydraulic Circuit and Standard Components

Diagram of the internal hydraulic circuit and list of components supplied as standard with the unit.

Recommended External Hydraulic Components

List of optional hydraulic components recommended for installer to provide for system integration.

Water Content and Quality Requirements

Table specifying minimum water content and required water quality parameters for unit operation.

System Loading, Emptying, and Draining

System Emptying Procedures

Step-by-step instructions for safely emptying the unit's system, including precautions.

System Draining and Freezing Prevention

Procedures for draining the system and methods to prevent freezing damage during winter shutdown.

Weight Distribution for Unit Supports

Empty Unit Weight Distribution

Table detailing the weight distribution percentages on supports for empty unit configurations.

Operating Unit Weight Distribution

Table showing weight distribution percentages on supports for units during operation.

Electric Connections and Power Supply

Mandatory Electric Connection Requirements

Essential mandatory requirements for safe and correct electrical connections, including earthing and phase checking.

Electric Power Connection Procedure

Step-by-step guide for connecting the unit to the main electrical power supply, including safety checks.

Electrical Data Specifications

User Interface and Control Keys

Interface Control Key Functions

Description of the function of each key on the user interface panel for unit operation and parameter adjustment.

Unit Start-Up Procedure

Menu Structure and Navigation Guide

User Operating Procedures

Moving Between Menus

Instructions on how to navigate through the unit's menu system using the control panel keys.

Selecting and Modifying Parameters

Steps for selecting and modifying unit parameters, including value adjustment and confirmation.

Unit Control and Commissioning

Preparation and Start-up Procedures

Steps for preparing the unit, performing preliminary checks, and executing the initial start-up sequence.

Hydraulic and Machine Commissioning Checks

Detailed checks for hydraulic circuits, machine operation, cooling circuit, and operational features during commissioning.

Routine Maintenance Procedures

Electrical, Hydraulic, and Cooling Circuit Checks

Yearly checks for electrical systems, hydraulic circuits, and cooling circuits to ensure optimal performance.

Mechanical Checks and Disposal

Mechanical inspections of unit components and guidance on proper unit disposal according to standards.

Troubleshooting Common Issues

AERMEC NRK 0150 Specifications

General IconGeneral
BrandAERMEC
ModelNRK 0150
CategoryHeat Pump
LanguageEnglish

Related product manuals