EasyManuals Logo

Afikim Breeze-C Maintenance Manual

Afikim Breeze-C
18 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #4 background imageLoading...
Page #4 background image
2. Specific Tools for technicians
Standard tool box (wrenches, socket-head cap screw, hexagon keys, Phillips
(crosshead) tip and/or screwdrivers, etc.)
Voltmeter (To measure 24VDC)
Air pressure gauge (To measure 35 psi)
Batteries tester (under load)
Density meter
Valve Wrench
Wooden blocks to elevate the Breeze during checks, maintenance and repairs:
2 blocks 20-22 centimeters height to place beneath the batteries box.
2 blocks 14-16 centimeters height to place beneath the foot rest area.
Remark : Always before operating a lifted Breeze make sure that the 2
rear wheels are free to turn , so that the scooters will not move.
3. Specific Parts:
We recommend the availability of the following set of test and repair assemblies:
1. Front Board
2. Main Harnesses Cable.
3. Main Lights Harness Cable.
4. Main Supply Harnesses.
5. Controller S-Drive 120A - P&G
6. Motor/Power Unit
7. Also it is very much recommended hold and use P&G SP1 Programmer (for S-
Drive, possible to upgrade old model of SP1 programmer to fit the S-Drive free
of charge.

Other manuals for Afikim Breeze-C

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Afikim Breeze-C and is the answer not in the manual?

Afikim Breeze-C Specifications

General IconGeneral
BrandAfikim
ModelBreeze-C
CategoryScooter
LanguageEnglish

Related product manuals