5. Commissioning Procedure
After all the cable (power and communication) connections are completed, please ensure
the following:
• Ensure the DC switch on the inverter is OFF
• Ensure the AC switch that is connected to the grid and EPS output (if used) of the
inverter is OFF
• Ensure the DC switch is OFF
For commissioning we recommend the following steps:
• Turn the DC switch ON
• Refer to
section 3.3.2 Start for turning on the battery
• Wait until the LED´s on
• Wait until the inverter LED´s on
Storage
Environment
Temperature
Relative Humidity of
Storage Environment
Storage Time
SOC
Below - 10
/ Prohibit /
-10~25
5%~70%
12 months
SOC
60%
25~35
5%~70% 6 months
SOC
60%
35~45
5%~70% 3 months
SOC
60%
Above 4 5
/ Prohibit /
Recharge Requirements During Normal Storage
Battery should be stored in an environment with temperature range between -10°C ~ +45°C
and maintained regularly according to following table with 0.5C(50A) current till 50% SOC
after long storage time.
Storage
Environment
Temperature
Storage Time
Note
-10~25
15 days
Battery Pack
disconnected to inverter
25~35
7 days
35~45
<12 hours
Battery Pack
connected to inverter
Recharge Requirements When Over Discharged
Over discharged (90%DOD) battery should be recharged according to following table,
otherwise over discharged battery will be damaged.
6. Maintenance
Fault
Normal
Fault
Normal
Fault
Normal
Fault
Normal
• Turn on the DC switch on the inverter
• Set up the battery and the inverter on the App
• Turn on the AC switch that is connected to the grid and EPS output of the inverter