The inverter needs maintenance periodically, the following details should be
noticed.
PV connection: check the PV connection twice a year
AC connection: check the AC connection twice a year
Earth connection: check the Earth connection twice a year
Heat sink: clean the heat sink once a year with dry towel
The LCD and LED will report the fault when the error occurs, please follow
thetrouble shooting list to solve the problem.
·Turn off the DC switch on the inverter;
·Turn off the PV switch of the system;
·Turn off the AC switch between inverter output and the public grid.
Follow the procedures below when the inverter needs to be restarted.
·Follow the Shut Down Procedures of Article 6 to shut down inverter;
·Follow the Commissioning Procedures of Article 5 to turn on the inverter.
Shut Down & Restart the Inverter
21
7.Maintenance&Trouble Shooting
6.Shut Down & Restart the Inverter
6.1 Shut Down Procedures
7.1 Maintenance
7.2 Fault Code and Trouble Shooting
6.2 Restart the inverter
Note:
The inverter will be operable after minimum 5 minutes.