EasyManua.ls Logo

AL-KO IQ7 - Hydraulic Connection; Bleeding Procedure

AL-KO IQ7
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HYDRAULIC CONNECTION
Connect the hydraulic brake line from the brake system on the towed vehicle to the brake
port on the AL-KO iQ7 actuator unit using a 3/8” UNF Brass Long Series Tube Nut.
Carefully ll the brake uid reservoir by removing the ller cap. Always use new brake uid.
Never attempt to reuse brake uid. The reservoir is full when the uid reaches the bottom of
the reservoir neck (the top of the sight glass). Do not over ll the reservoir. Be careful not
to spill brake uid between the reservoir and the front cover. The brake uid level must
never fall below the ‘minimum’ line indicated on the sight glass.
Bleeding
Bleeding instructions using AL-KO iQ7 Pressure Bleed Gun
1. Fill reservoir with clean Dot 4 brake uid to just
below the top of the sight glass.
2. Place the pressure bleed gun (available from AL-KO
p/n 350045) socket gently over the neck of the
reservoir applying gentle pressure to locate the bleed
socket O Ring in
3. Do not push on with excessive force or damage
may be caused to the reservoir or the O ring on the
pressure bleed gun socket. Rub a small amount of
brake uid around the inside of the reservoir neck to
assist tting. Screw the cap fully closed.4. Attach
the bleed gun to the actuator uid reservoir (as
shown in diagram 1.) and place the other end in a
bottle of new brake uid
4. Attach the bleed gun to the actuator uid reservoir
(as shown in diagram 1.) and place the other end in
a bottle of new brake uid.
5. Open the bleed screw on the trailer brakes (start with the furthest calliper/brake) at
least one full turn. Place a clear exible hose over the bleed screw and immerse the
other end into a container partially lled with brake uid.
6. Squeeze the pressure bleed gun repeatedly (not too fast or cavitation may occur)
ensuring that the bulk brake uid tank and the reservoir do not run out of brake uid
or air will enter the hydraulic system. At no stage let the uid level in the reservoir fall
below the minimum uid level indicator.
3
Actuator
Actuator
Bow Post
Mounting bush
Rubber grommet
Over tightened Correct
Brake Fluid
Reservoir
Master
Cylinder
Port
Pressure
Dump Valve
100mm
140mm
168mm
281mm
Diameter: 6.0mm of 1/4”
Maximum Fluid Level
Minimum Fluid Level
Diagram 1.
Attaching the
bleed gun to
the actuator.
Bleeding
(Diagram 2)
alko.com.au

Other manuals for AL-KO IQ7

Related product manuals