EasyManua.ls Logo

Alliance Laundry Systems UW60B2 - Maintenance - Quarterly Checklist; Quarterly Preventive Maintenance Checklist Form

Alliance Laundry Systems UW60B2
32 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
Maintenance
F232223
30
Quarterly Preventive Maintenance
Checklist
Machine ________________________
Operator _______________________
Quarter
Checks
Observe All Safety Warnings!
Disconnect power to the washer-extractor before performing the
quarterly maintenance procedures.
1. Tighten door hinges and fasteners, if necessary.
2. Tighten anchor bolts, if necessary.
3. Verify that the drain motor shield is in place and secure.
4. Check all painted surfaces for bare metal. Repair, if necessary.
5. Clean steam filter, if applicable.
6.
7.
8.
9.
10.
11.

Related product manuals