EasyManua.ls Logo

Amada IPB-5000B - Page 20

Default Icon
131 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IPB-5000B
5. Installation and Connection
5-4
(2) Connecting [SENS] Cable to transformer.
Connect [SENS] Cable from Welding Transformer I/O Signal Connector
(See 4.(2)) in the rear panel of IPB-5000B to Welding Transformer.
(3) Connecting Start Cable
Connect Start Cable from Terminal Strip for External Input/Output Signal
(See 4.(2)) in the rear panel of IPB-5000B to Terminal Strip for Start Switch in
Welding Head.
(4) Connecting Voltage Detecting Cable
Connect the Voltage Detecting Cable in the case of using Constant Voltage
Control, Constant Current/Constant Voltage Combination Control and Constant
Power Control.
(5) Connecting a power supply
Connect Input Cable from Breaker for Welding Power Input (See 4.(2)) in
the rear panel of IPB-5000B to Earth Leakage Breaker.
Connect the earth cable to PE Terminal.
(6) Connecting a necessary External I/O Signal Cable to Terminal Strip for
External Input/Output Signal (See 4.(2))
Prepare cables for the connection, referring to 8. External Interface.

Related product manuals