EasyManuals Logo

Ametek T-2 User Manual

Ametek T-2
31 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #10 background imageLoading...
Page #10 background image
Setup 8
Type T Pump Operation Manual
3 Close the vent valve.
Note: If using the T-1-CPF, ll with test uid through the gauge connections. This may take approximately 15 minutes.
Note: It may be necessary to prime the pump, particularly for rst time use, or if the pump has been inactive for an extended period of time.
Refer to Priming on page 10 for instructions on priming the pump.
4
Pull the pump handle to the top of its stroke.
5 Pull out the valve rod selector to select the low pressure/high volume setting.
6 Gently operate the pump handle until test uid lls the top of the pressure ports on the pressure manifold.
Note: Lightly tap the manifold to make sure that any air bubbles sticking to the walls or in low ow areas are released to oat to the surface.
7 Attach the reference instrument and the device under test to the manifold.
Note: If CPF Fittings are used in your pressure system, remaining air can be purged by applying 10 psi or less and loosening the CPF tting closest to the pres
-
sure device. When uid and air escape from the CPF weep hole, that portion of the system is purged. Repeat this process for each pressure device in the
pr
essur
e system which is connected to a CPF tting.
!
CAUTION: Always choose a reference instrument with a range equal to or greater than the range of the device under test.
8 Ensure all connections are tight and leak free.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ametek T-2 and is the answer not in the manual?

Ametek T-2 Specifications

General IconGeneral
BrandAmetek
ModelT-2
CategoryWater Pump
LanguageEnglish

Related product manuals