EasyManuals Logo

Ametek T-2 User Manual

Ametek T-2
31 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #11 background imageLoading...
Page #11 background image
Operation and Maintenance 9
Type T Pump Operation Manual
Operation and Maintenance

GENERATING PRESSURE
Note: It may be necessary to prime the pump, particularly if the pump has been inactive for an extended period of time. Refer to Priming on page 10
for instructions on priming the pump.
1
Check that the vent ll plug is fully open by turning it counter-clockwise.
2 Open the vent valve.
Open the vent plug… then open the vent valve.
3 Set the valve rod selector to control your desired uid output volume.
!
CAUTION: Only move the valve rod selector while the pump handle is stationary, in the up position.
Note: With the valve rod in the out” position, uid ow will be at maximum and the maximum achievable pressure will be 1000 psi. To exceed 1000 psi,
push the valve rod in.
Low Pressure/
High Volume
High Pressure/
Low Volume

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ametek T-2 and is the answer not in the manual?

Ametek T-2 Specifications

General IconGeneral
BrandAmetek
ModelT-2
CategoryWater Pump
LanguageEnglish

Related product manuals