Model 415
Operation Manual
Document No. 740084
Revision N
iv
TABLE OF CONTENTS
SECTION DESCRIPTION PAGE
SECTION V OPERATION
5.0 Introduction 30
5.1 Initial Power-On 30
5.2 Power Supply Calibration Introduction 30
5.3 Required Equipment For Calibration 31
5.4 Main Reference Voltage Calibration 31
5.5 Position Feedback Voltage Calibration 32
5.6 Current Calibration 32
5.7 Arc Voltage Calibration 35
5.8 Weld Head Travel Calibration Introduction 36
5.9 Weld Head Travel Calibration 37
5.10 Weld Head Wire Feed Calibration 38
5.11 System Security 39
5.12 Project Data Recording 40
5.13 General Maintenance 40
5.14 System Fault Corrections 41
5.15 Re-Shipping 42
5.16 Selecting and Creating Languages 43
5.17 Creating and Editing Weld Head Templates 45
5.18 CMOS Battery Replacement 47
LIST OF ILLUSTRATIONS
NUMBER DESCRIPTION PAGE
Figure 1 System Configuration 14
Figure 2 AC Power Set Up (Transformer jumpers - International) 15
Figure 2A AC Power Set Up (Transformer jumpers - Domestic) 18
Figure 3 Cable Connections 19
Figure 4 Status Screen/Initial Turn-On 20
Figure 5 Sequence Timing Chart 29
Figure 6 CMOS battery location on EP811 motherboard 47
Figure 7 CMOS battery location on SBC84710 motherboard 48