10. The driver‘s station assembly
Platform removal
Loosen nuts of the driver‘s station.
Fold the station using the lifting hydraulic motor.
Disconnect the cable on the injection pump (3), drain partially
the cooling uid, disconnect heater hoses (1), (2), electrical ca-
bles, remove power steering assembly underneath the cabin,
disconnect anchor chain, lower the cabin, hook up the hoist by
the eyelets on the cabin roof and lay it aside.
Assemble in reverse order, add cooling uid.