EasyManua.ls Logo

Ammann Cummins ASC110 - Page 151

Ammann Cummins ASC110
218 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
147ASC 110
ASC445
WORKSHOP MANUAL
How to install the segments onto the Drums sur-
face
With the bolted M20 8G connections tightened at torque
390 Nm (287,6 lb ft), operate the Machine with low or high vi-, operate the Machine with low or high vi-
bration switched ON and with travel speed 1 set in time interval
of two minutes, stop the Machine, conrm bolted connections
are tightened. Following that, operate the Machine in minimal
time interval of 1 hour, you may adjust travel speed within 1-3
range, and then check again bolted connections are tightened.
Check continuously bolted connections
during Machine drive.
When driving the Roller in the above
mentioned process NEVER use high or
low vibration frequency on the surface
already being compacted, hard subsur-
face or frozen surface.

Related product manuals