ANCHEER
7
Installation And Adjustment
Open the package of the bike, take out the electric bike and all the accessories inside and
use the tool to cut off the packing rope.
1. Install the handlebar
2. Assemble the saddle tube
1.1
2.1
1.2
Install the handlebar into the folding stem and unfold the folded stem and fasten
the buckle.
Install the saddle tube into post receiver. Set right its position and adjust height
to fit your ridding habit. (Note: please be careful not to exceed the limit line) and
then tighten the seat with the clamp.
Adjust the height of the stem(Note: please be careful not to exceed the limit line.),
and then fasten the clamp.