EasyManua.ls Logo

ANFIM SP- II - Installation of the Appliance; Placement and Connection; Using the Appliance; Basic Operation

ANFIM SP- II
10 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TYPE
SP - II 220-240V
Height:
620 mm
620 mm
Width:
220 mm
220 mm
Depth:
370 mm
370
Power:
720 W
720 W
Noise level:
< 70 dB (A)
< 70 dB (A)
Blades diameter:
75 mm.-SP-TIT. ANFIM
®
Weight:
17 Kg
17 Kg
SP - II 110V
mm
4
3.4 Table of specifications
4. Installation of the appliance
4.1 Installation of the appliance
4.2 Connecting the appliance to the mains
The coffee grinder must be placed on a flat solid, and dry surface.
Single-phase 220V version (240V and 110V on request)
5. Using the appliance
5.1 Instructions for use
WARNING:
The electric installation to which the coffee grinder will be connected must be in
compliance with the law in force.
The manufacturer refuses all responsibility for damages and injuries to persons
that might occur due to improper installation and/or improper electric power
installation not in compliance with local safety standards.
A) Fill the hopper with fresh coffee beans (max. capacity is approx. 2kg).
B) Open the hopper slide. (2)
C) Turn the ON/OFF switch on (3). It will light up and coffee grinder is now
ready for operation. The display will show “DOSE 1 CUP or “DOSE 2 CUPS”
according to last selection.
The coffee grinder is supplied with an electric cord and a moulded plug
and must be connected only by an authorized electrician to a power
socket (max. rating 15A) that is in compliance with the data printed on
the serial number plate of the grinder located either on the rear side or
on the bottom plate of the grinder.
75 mm.-SP-TIT. ANFIM
®

Related product manuals