EasyManua.ls Logo

Anglecare AC527 - Setting Up the Parent Unit; Charge Parent Unit; Setting Up the Sensor Pad; Install Sensor Pad Battery

Anglecare AC527
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
E
N
5
1 SETTING UP THE PARENT UNIT
Charge the Parent
Unit 8 hours
prior to first use
Regular charging time
is 4 hours
8H
1
3
2
2 SETTING UP THE SENSOR PAD
e Sensor Pad is designed to detect subtle baby movements on the surface of the
mattress.e alarm will only sound if NO movement is detected for 20 seconds.
1
2
1. Remove the battery cover
and insert the battery face
with + face up
2. Replace the battery cover,
align 2 dots and click to secure
Correct positioning
for slatted base
3
3. Remove the mattress from
the cot, place Sensor Pad
- Angelcare® logo side
up - on base in approximate
centre of mattress. It should
be centred on the hardboard if
your cot requires a hardboard
support (see ‘IMPORTANT’ note
below)
4. Replace the mattress
CFO4C_ANGE_Manuel_AC527_ROW.indd 5 19-02-05 09:32

Related product manuals