EasyManua.ls Logo

APEC PERMEATE-PUMPED R.O. SYSTEM - User Manual

APEC PERMEATE-PUMPED R.O. SYSTEM
6 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
APEC PERMEATE-PUMPED R.O. SYSTEM: Installation
Addendum
How to install your RO-PERM system:
The steps for installing your Permeate Pumped RO system are the same as for installing the
non-pumped systems.
Please follow instructions in the Installation Manual from Pages 1 – 11.
When you get to Step 6: “Connecting the System” in the Manual, use this Addendum
for Steps 6. (Skip Manual pages 12-16).
Step 6: Connecting The System
Fitting Types: There are 3 types of fitting provided for connecting the system
1. Metal compression nut fitting
(comes with 1 insert, 1 sleeve, 1 nut)
Fig. 11
Important! Use plastic sleeve on the plastic tubing we provide.
Do Not use metal sleeve on plastic tubing or the connection
will leak!
1
free drinking water.com
Question and Answer IconNeed help?

Do you have a question about the APEC PERMEATE-PUMPED R.O. SYSTEM and is the answer not in the manual?

APEC PERMEATE-PUMPED R.O. SYSTEM Specifications

General IconGeneral
TypeReverse Osmosis
Stages5
Filter Life (pre-filters)6-12 months
Filter Life (RO membrane)2-3 years
Storage Tank Capacity4 gallons
Waste Water Ratio3:1
Operating Pressure40-85 psi
Operating Temperature40-100°F
System TypeUnder-sink
PumpPermeate Pump (non-electric)
Included ComponentsRO system, storage tank, faucet
Weight25 pounds

Summary

APEC RO System Installation Addendum

Connecting The System: Fitting Types

Details the three types of fittings (metal compression, plastic compression, quick-connect) used for connecting tubing.

Detailed Tubing Connections

Summary of Tubing Connections

Overview of the four main tubing connections and their color coding for the RO system.

Point Z: Faucet Connections

Instructions for connecting clear tubing to the RO faucet using a plastic sleeve and insert.

Point X: Feed Water Connection

Instructions for connecting red tubing to the feed water needle valve with a plastic sleeve and insert.

Point W: Wastewater Connections

Instructions for connecting black tubing from the pump's 'Brine Out' to the drain saddle.

Point A: System Water Inlet

Instructions for connecting red tubing to the RO's stage-1 prefilter.

Point H: Stage-5 Filtered Water

Instructions for connecting clear tubing from the faucet base to the Stage 5 filter outflow.

Point G: Stage-5 Filters T-fitting

Instructions for connecting yellow tubing to the Stage-5 filter's T-fitting.

Point Y: Tank Input & Output

Instructions for connecting yellow tubing from the Stage-5 T-fitting to the tank's valve.

System Options and Operation

Ice-maker Connection Option

Details on connecting product water to an icemaker, including required fittings.

System Start-Up

Instructions for starting up the RO-PERM system after installation.

How Permeate Pump Works

Explanation of the permeate pump's function, including its Auto-Shut-Off feature.

Related product manuals