EasyManua.ls Logo

APEC RO-PERM - Page 40

Default Icon
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
37
How wastewater is disposed via Air-Gap faucet:
Waste water is routed through the Air-Gap faucet prior to being drained off into the standard drain-
pipe outlet. The 1/4” BLACK waste water line from the RO system will discharge through the 1/4”
RED line to the Air-Gap faucet. The waste water will then flow back down the 3/8” BLACK waste
water line of the Air-Gap faucet to your drain pipe.
Pure water output flow:
After the Air Gap faucet is installed, the RO pure water output line will flow from the Stage-5 filter,
through the BLUE line of the Air-Gap faucet, to the dispensing faucet.
* * * End AirGap Faucet Installation * * *

Related product manuals