EasyManua.ls Logo

Aqualisa QUARTZ DIGITAL SERIES - Page 8

Aqualisa QUARTZ DIGITAL SERIES
17 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Quartz bath with overflow filler installation instructions Page 8
Choose the position for your Digital processor as close to the bath
control as possible. The processor may be sited in the roof space
above the proposed bath site, in the airing cupboard or behind a
screwed bath panel if more convenient. If siting in the roof
space, ensure that freezing cannot occur and that no insulation
material is placed under or over the processor. Please refer to the
system layout diagrams.
3
!
THE PROCESSOR MUST BE SITED IN A POSITION THAT IS SAFELY
ACCESIBLE FOR SERVICING AND COMMISIONING PURPOSES. WHEN
FITTED IN THE LOFT SPACE, THE ROUTE TO AND THE AREA AROUND
THE PROCESSOR MUST BE BOARDED TO ENSURE A SAFE WORKING
ENVIRONMENT.
The distance between the Digital processor and bath control must
be within range of the 10m data cable supplied.
Place the Digital processor on a solid
mounting surface, adjusting the fixing
feet into suitable positions. Mark then
drill and prepare suitable fixings before
securing the processor to the mounting
surface using the screws provided.
4
Flush through both hot and cold supply pipes.
5
The maximum hot water inlet temperature must be no more than
65˚C.
!

Related product manuals