33GHA l Switchgear extension and replacement of a panel
Annex5
The required auxiliary equipment is described in the Assembly Instructions.
In addition, the surge-proof end caps are required for panel replacement.
Description Quantity Item no.
flat end caps 6 AGS 000 618-02
high end caps 6 AGS 000 634-02
Assembly kit for end caps
- special grease
- disposable gloves
- cleaning cloth
2 AGS 001983-01