INSTRUCTIONS FOR INSTALLATION AND MAINTENANCE
安装和维护说明手册
D0578-02-ZH
3/100
AREVA T&D S.p.A. – Via Meucci, 22 30020 Noventa di Piave (VE) ITALY – Tel. : 39 0421 309511 – Fax : 39 0421 65254
Subsidiary of AREVA T&D Italy SpA (AREVA group) with registered office in Via Meucci, 22 30020 Noventa di Piave (VE) - ITALY, under Art. 2359 of the Italian Civil Code.
6.4.7 Support of the vertical drive shaft of the earthing switch (Fig. 5A, 5B, 5D, 5E)
接地开关(图
5A
5B
5D
5E)
垂直驱动轴的支架
...............................................................................................................................................31
6.4.8 Intermediate guide and upper sections of the vertical drive shafts (Fig. 1A, 1B, 4B, 4D, 7A)
中间导轨和垂
直转动轴(图
1A
1B
4B
4D
7A
)的上半部分。
..............................................................................................32
6.4.9 Lower section of the vertical drive shaft and drive (Fig. 7, 7A)
垂直驱动轴的下半部分和操作机构(图
7
7A
..........................................................................................................................................................................33
6.4.10 Lower section of the vertical drive shaft and drive of the earthing switch (Fig. 7, 7A
垂直驱动轴的下
半部分和接地开关(图
7
7A)
的操作机构
................................................................................................................35
6.4.11 Mechanical interlocking device (Fig. 5C, 5F)
机械连锁装置(图
5C
5F
..........................................36
6.5 ADJUSTMENT OF THE S2DA / S2DAT DISCONNECTORS S2DA/S2DAT 隔离开关的调整...................................37
6.5.1 Adjustment of the live part (Fig. 2E, 2F)
过流部件的调整(图
2E
2F
...................................................37
6.5.2 Adjustment of the earthing switch (Fig. 8, 9)
对接地开关(图
8
9
)的调整
.............................................38
6.5.3 Vertical drive shaft and drive (Fig. 7)
驱动机构和垂直驱动轴(
7
......................................................39
7.1 CONNECTIONS 接线 .........................................................................................................................................39
7.2 FINAL CHECKS AND FINE-TUNING 最终检查和微调................................................................................. 39
8. MAINTENANCE PLAN 维护计划 ............................................................................................................................ 41
NTC-1955/E ....................................................................................................................................................................42
9. DISASSEMBLING THE SWITCHGEAR AND REPLACEMENT OF MAIN PARTS 隔离开关的拆卸及主要
部件的更换 ..............................................................................................................................................................................46
9.1 DISASSEMBLING THE DISCONNECTOR 隔离开关的拆卸 .........................................................................46
9.1.1 Disconnection
断开
.........................................................................................................................................46
9.1.2 Disassembly
拆卸
............................................................................................................................................46
9.2 DISASSEMBLING THE EQUIPMENT AND REPLACEMENT OF MAIN PARTS 设备拆卸和主要部件的
更换 ...............................................................................................................................................................................47
9.2.1 Male mobile contacts (Fig. 2, 2A, 2B)
雄动触头(图
2
2A
2B) ...............................................................47
9.2.2 Female mobile contacts (Fig. 2, 2A, 2B)
雌动触头(图
2
2A
2B)............................................................48
9.2.3 Drive [operating mechanism] (Fig. 7)
驱动机构(图
7
.............................................................................48
9.2.4 Flexible conductors
柔性导体
.........................................................................................................................49
9.2.5 Ball joints of the adjustable thrust linkages
可调节推力连杆的球铰
............................................................49
10. LIST OF TOOLS 工具列表.................................................................................................................................... 50
11. SPARE PARTS 备品备件....................................................................................................................................... 50
ATTACHMENT "B": TIGHTENING TORQUES FOR SCREWS & BOLTS ..................................................................99
附件 B 螺钉螺栓紧固扭矩......................................................................................................................................99
ATTACHMENT "C": RECORDING FORM FOR COMMISSIONING OF SWITCHGEARS ......................................100
附件 C: 开关设备调试记录表................................................................................................................................100