EasyManua.ls Logo

Argon 18 KRYPTON - Bottom Bracket Cable Routing

Argon 18 KRYPTON
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
KRYPTON : 3. Cable housing installation (continued)
Front and rear derailleur: Pass
the two cables inside the
frame starting at the top tube
until they comes out under the
bottom bracket.
Pass both cables into the cable
guide (4d). Make sure the
5mm screw is set to 1.5 Nm.
For a Di2 conguration, use
the bottom bracket dedicated
cover for electric shifting (4i).
It’s better to install the cables
before installing the bottom
bracket and crank.

Related product manuals