2.3.1 UNCRATING
Cut and remove the outer packaging. Cut the (4) clamps that hold the equipment to the skid lift the unit off the
skid.
2.3.2 INSTALLATION OF LEGS (IF APPLICABLE)
LEGS ASSEMBLY:
The Appliance could be mounted on a table or counter noncombustible.
Mount Legs on bottom of product, the appliance may be further leveled with adjustment in the foot of
the leg.
Legs may provide as accessories.
2.4 Gas Connections
The gas supply (service) line must be the same size or greater than the inlet line of the appliance. SI appliances
use a ¾” NPT inlet.
Pipe joint compound must be resistive to Natural or LP gas.
For equipment using propane gas do not install supply lines with a diameter less than ½ under any
circumstances.
All connections must be tested with a soapy water solution before lighting any pilots.