S8
S19
BOLT NUT
#43 Bolt M10*45
( 4 pieces)
#32 Nylon nut M10
( 4 pieces)
#51 Nylon nut(L/R) 1/2’
( 2 pieces)
#19 Washer D8Xφ32*2
( 2 pieces)
WASHER
#18 Bolt M8*16
( 2 pieces)
#46 Bolt(L/R) 1/2’’
( 2 pieces)
Hardware Required
3. Fix the Lower Handle Bar (25L)&(25R) to the Upright Post (15) with Bolts (18),
Washers (9) and D Washers (19). Fix the Pedal Tubes 42L & 42R with the Pedal
Crank by inserting carefully the Pedal Hinge Bolts 46 L & 46 R, Curved Washers
(50) and Nylon Nuts 51L & 51R. Install the Pedal (44) on the Pedal Tube (42L) &
(42R) with Hex Head Bolt(43), Nylon Nut (32).
STEP 3
ASSEMBLY INSTRUCTIONS
14
ASCEND L-200 PERFORMANCE ELLIPTICAL
#50 Spring washer 1/2’’
( 2 pieces)
#9 Arc Washer D8
( 2 pieces)
#47 Arc Washer D17
( 2 pieces)
S13