EasyManuals Logo

Atag A-Series User Manual

Atag A-Series
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #17 background imageLoading...
Page #17 background image
ATAG A-Serie
17
Work on the installation should only be carried out
by qualied personnel with calibrated equipment.
When replacing parts, only ATAG Service
components may be used.
If you smell gas:
- No naked ames! No smoking!
- Do not switch lights on or off or use other
electrical switches.
- Do not use the phone
- Close the gas mains
- Open windows and doors
- Warn the occupants and leave the building
- Only call the gas company or installer once you
are outside the building.
Corrosion protection
Do not use sprays, chlorine-containing cleaning
products, solvents, paints etc. in the vicinity of the
device or its air supply. These substances have
an adverse impact on the device and can lead to
corrosion that may result in failures.
Checking the heating water
Regularly check the water pressure of the heating
installation
Always use potable water for lling the installation.
Adding chemical agents such as frost and
corrosion inhibitors are only to be added by your
installer.
If in doubt, check with your installer or ATAG
Heating UK Ltd (See contact details on page 25).
2 Safety
Unit 3A, Thornton Road Ind. Estate Off Hockney Road Bradford, BD8 9HQ
01274 488 388
www.heatingspares247.com

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atag A-Series and is the answer not in the manual?

Atag A-Series Specifications

General IconGeneral
BrandAtag
ModelA-Series
CategoryBoiler
LanguageEnglish

Related product manuals