EasyManuals Logo

Atag i24C Installation & Servicing Instructions

Atag i24C
82 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #37 background imageLoading...
Page #37 background image
Installation & Servicing instructions ATAG iC-Range
37
When powering up the boiler (described in chapter 13) an automatic air purge program will run to vent the
boiler. During this program the pressure in the central heating needs to be checked, and when necessary,
topped up again.



again.

connections with the cap nut (3).
11.1 Hot water supply
Fill the hot water supply by opening the cold mains isolation valve.
Bleed the hot water installation by opening all hot water taps one at a time. Leave each tap to run until all air
has disappeared from the supply.
Flush with a minimum of 10 litres to rinse any residual contaminants from the hot supply and boiler.

Table of Contents

Other manuals for Atag i24C

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atag i24C and is the answer not in the manual?

Atag i24C Specifications

General IconGeneral
BrandAtag
Modeli24C
CategoryBoiler
LanguageEnglish

Related product manuals