EasyManua.ls Logo

ATB AQUAmax BASIC series - Commissioning (Continued)

ATB AQUAmax BASIC series
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation and maintenance manual AQUAmax
®
BASIC/CLASSIC
ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com /
Art.-No.: 9060 0210 / Status: 30.01.2019 / Page 11 from 40
New plant?
With yes the sludge return feed is suppressed for half a year (run-in phase).
Test run
In test run operation the current float level and the current power input are
indicated. Pressing OK carries out the test run.
With this make absolutely sure that no one is working in the danger area of the
running submerged aerator!
The individual units are taken into operation for 4 seconds and are checked for overload and/or
underload. If the minimum permitted value is undercut or the maximum permitted value is
exceeded a warning signal results.
By manual switching of the float switch (BASIC / CLASSIC: submerging in or removing from the
water) the test run can be repeated and concluded.
AQUAmax
®
BASIC and CLASSIC are equipped with the AQUAswitch
©
. With this you are
concerned with a reed contact switch, which is integrated in the air intake line. The actual
float body cannot be seen from outside. For switching, the AQUAmax
®
has to be
submerged or removed or tilted.
The test run can be interrupted through OK.
Saving of the parameters
Have you made an incorrect input? By selecting no and OK the
commissioning can be repeated.
If the inputs are correct, confirm with yes and OK.
Float at the top =
Contact closed
Float at the bottom =
contact open