ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com
All parameters are set back to the values for the selected
plant type and the population figure.
Test run
Mode of operation s. Commissioning.
Winter operation
Activation/deactivation of the winter operation (Standard:
activated).
With the activation the aeration times in the months
December, January and February are reduced by 20%
(no further reduction following activated sludge removal).
Manual mode
In the manual mode the individual units can be commissioned
manually and the function of the potential-free contact can be
checked.
With the changeover to manual operation the normal
programme sequence is maintained (all units = OFF) and
following ending of the manual operation is continued at the respective point.
Indicated are the position of the float switch and the actual current consumption.
Info
Under this point you can call up the details for the selected type,
the PT value set, the version number and the date of
commissioning.
Date / Time
Possibility for input / correction for date and time.
Important for the correct entries in the logbook!
Language
Possibility of modifying the language settings.
Delete error
Following acknowledgement of an error message this, with a
renewed occurrence over a period of 72 hours, is suppressed.
If this is not wanted, i.e. the error should be reported
immediately with the next occurrence, press OK.