EasyManua.ls Logo

Atlas Copco LH 11

Atlas Copco LH 11
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
LH 11, 18, 19 E, 22, 23 E, 27, 28 E, 39, 40 E
© 2008 Atlas Copco Construction Tools AB
|
No. 3392 5143 01
|
2008-02-29
Overhauling instructions
6. Apply Loctite or similar to the guide socket
thread
7. Mount the spool at the T side (notice the
milling)
8. Apply Loctite or similar to the spool thread
9. Tighten the guide sockets with the torque
wrench
10. Place the steel ball and the washer
11. Apply Loctite or similar and tighten the
screw

Related product manuals