EasyManua.ls Logo

AutomationDirect C-more EA9-T7CL-R - Page 120

Default Icon
140 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 5 - System Setup Screens
5-29
®
1
2
3
4
5
6
7
8
9
10
11
12
13
14
A
B
C
D
EA9-USER-M Hardware User Manual, 1st Ed. Rev. K
Test Menu – PLC Serial Comm Port – Loop Back Test
Test Results
1.) Bytes Sent:
The number of bytes sent after a test is started.
2.) Receive Counts:
The number of bytes which are received after the test is started.
3.) Error Counts:
The number of bytes which have not been received after the test is started.
4.) RTS/CTS Test: Pass/Fail
RTS is turned on and if CTS receives the signal then the test shows “Pass”, otherwise the
test shows “Fail”.
NOTE: The test will continue to run until the Cancel button is pressed. If there are any error counts, check the loop
back connector.
]

Table of Contents

Related product manuals