EasyManua.ls Logo

Avalon A13CT-S - Page 25

Avalon A13CT-S
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19
10. After the installation of the water
line and filters is complete, plug the
power cord into a grounded wall
outlet and begin to use the machine.
Please allow the machine about 10-
15 minutes for the water to fill in the
tanks before use.
11. Be sure to dispense a little water from
the spout (#10) prior to turning on the
cooling and heating switches (#18, #19)
located on the back of the cooler.
15-20
min
Hot
9. Locate the Adapter with Valve that
is connected to the water source. Turn
this valve to the on position (parallel
to the PE Tubing) to allow the water to
flow through.
Finishing the Water Cooler Installation
Getting Started

Related product manuals