EasyManua.ls Logo

AvantaPure 269 - Level II Programming Introduction; Advanced Conditioner Settings; Calendar Override Configuration

AvantaPure 269
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26 Level II Programming
Rev C
Level II Programming
Level II program parameters are those parameters used to fine-tune a
conditioners operation. These are accessible by pressing and holding the
UP and DOWN buttons until the display goes blank. Then release the
buttons. Calendar Override is the first Level II parameter displayed. Level II
program parameters include:
269 Conditioner Operation Type
CALENDAR OVERRIDE
SALT AMOUNT
CAPACITY K GRAIN
HARDNESS GPG
SELECT LANGUAGE
CLOCK MODE
UNITS OF MEASURE
INJECTOR SELECTION*
BACKWASH
SLOW RINSE
FAST RINSE
OPERATION TYPE 269*
SERVICE INTERVAL
CHLORINE GENERATOR
*View only.
Level II parameters will, in almost all cases, be preset to meet your
configuration needs. The predefined system number will preprogram all of
the Level II parameters to the selected default values.
Setting the Calendar Override
Calendar Override allows the programmer to set the maximum days
between regenerations. A setting of 0 (zero) means the calendar
override is disabled. To change the calendar override, press the SET
button while the words “CALENDAR OVERRIDE" appear on the banner
display. The blinking digit can be changed to the desired numbers of
days. To lock in the parameter, press the SET button.
The calendar override days between regeneration must be set to zero
to enable regeneration on specific days.
WARNING: Setting days between regeneration to zero will cause the
system to not regenerate. This setting is used for selecting regeneration
on specific days or to use with a remote regeneration input. See below.
NOTE: Regeneration on specific day is used to provide regeneration
when water demands are not steady. Example: If the weekdays have
low usage and the weekend is high, then regeneration every three days
will not meet the requirements.