EasyManua.ls Logo

Barbeques Galore G2CBL - Build-In and Island Assembly Steps

Barbeques Galore G2CBL
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 20
A leak test as outlined later must be done when connecting to the gas and before lighting the bbq.
Once you have assembled both side shelves, proceed to Step 13
Assembly instructions (continued)
Only if you have purchased a build-in or an island:
STEP 12 BUILD-IN / ISLANDS ONLY: Attach the build in support
brackets and separator panel.
WHAT YOU NEED
1 x separately supplied build-in kit (code CDBIKL) includes:
2 x brackets
8 x M6*35mm screws
1 x 4B front dress piece
Only for 2 burner build-in, you may also require separately supplied grease channelling tray front
dress piece (code: CDBIK2)
(a) Carefully lay the firebox / hood assembly on its back as shown.
(b) Unscrew the existing M6*15 mm flat head screws on the side panels as indicated below.
(d) Adjust the corrugated
gas pipe so that it is neat
and out of the way. It is
safe to bend this pipe
gently by hand.

Related product manuals