PlantMaster Client - Server concept: Wireless monitoring
Connecting remote sites
PlantMaster supports the connection of multiple plants to
one central server.
In the remote site, M-servers or WDl-servers, connected to
a leased telephone line or the company’s Intranet, link
the machines to the central computer system. A dedicated
“multi-site consolidation module” on the central PlantMas-
ter server allows integrated reporting for all sites into one
single reporting environment.
ERP system integration
PlantMaster is easily integrated with the customer’s ERP
system. Through a standard interface, order and product
data is transferred from the ERP system and imported in
the PlantMaster database.
The integrated export functionality allows a straightforward
upload of production data, calculated production schedules,
work-in-progress and performance indicators from Plant-
Master to the ERP system.
PlantMaster uses the standard TCP/IP protocols for integra-
tion with the host computer.
Real time monitoring
Cycle time monitoring
Downtime and scrap analysis
Key performance indicators (OEE)
Planning and scheduling
Multi resource scheduling
Kan Ban
Ticket printing
Quality control
Process and product parameters
Variables and attributes
Control charts & alarms
Traceability
Automotive, cosmetic, …
Per single product or lot
User friendly reporting
Machine and mold maintenance
Based on real production
Operator planning and tracking
Software modules