EasyManua.ls Logo

Bard W3RV2-R - Figure 3 B Mounting Instructions

Default Icon
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manual 2100-615A
Page 9 of 24
FIGURE 3B
W5RV2, W5LV2, W6RV2, W6LV2
MOUNTING INSTRUCTIONS
B
16"
16"
16"
16"
16"
1
7
8
"
6
1
2
" 6
1
2
"
2
1
8
"
7
8
"
1"
3"
4"
Typ.
4"
Typ.
6
1
2
"
30"
E
16"
A CC
3
1
8
"
D
WALL STRUCTURE
AIR DUCT IS REQUIRED
SILICONE CAULKING BE PLACED BEHIND
1/4" MIN. CLEARANCE FROM
REQUIRED DIMENSIONS TO MAINTAIN
COMBUSTIBLE MATERIALS
FROM COMBUSTABLE
REQUIRED DIMENSIONS TO MAINTAIN
RECOMMENDED 1" CLEARANCE FROM
COMBUSTIBLE MATERIALS
A
29
C D EB
10 1/2
6 1/4 1 1/4 29 3/430 1/2
12 5 1/2
2
PANEL
SUPPLY AIR
NOTES:
RETURN AIR
2
Dimension is 10" on T48H1 & T60H1.
3
Dimension is 6" on T48H1 & T60H1.
2
WALL
DUCT
OPENING
THE SIDE MOUNTING FLANGES AND UNDER
FOUR SIDES OF SUPPLY
FOAM AIR SEAL
TOP FLASHING AT TIME OF INSTALLATION.
TOP.
MATERIALS
HEATER ACCESS
1/4" CLEARANCE ON ALL
IT IS RECOMMENDED THAT A BEAD OF
1
RAIN FLASHING
SUPPLIED
Right Side ViewWall Opening and Hole Location View
1
32
Dimension is 21" on 95" tall units.
1
Supply Opening
Return Opening
SEAL WITH BEAD
OF CAULKING ALONG
ENTIRE LENGTH OF
TOP
3
MIS-3079

Table of Contents