EasyManua.ls Logo

Barnes EcoTRAN - Page 26

Barnes EcoTRAN
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26
Step 20: TIDY-UP & COVER INSTALLATION
Coil, secure and loop the cords and harnesses to the harness hooks
Fix any ruts or depressions, which may have occurred during installation.
Check fi nal grade, (page 19) so it does not interfere with station operation
STANDARD VENTED ROCK COVER INSTALLATION
The cover gasket is a large soft O-ring that is factory installed. Lube the O-ring lightly with the provided lube. Then
install the cover. The rock cover is secured with a twist lock mechanism. Rotate the rock cover clockwise (while
looking at top of cover). Insert lock thru the adapter lock hub and cover lock eye and lock. To remove, unlock rock
cover and turn counter-clockwise.
See APPENDIX 4 for OPTIONAL
Flood Plain Rock Cover Installation.