Insert rst plastic post channel into post as
shown. Working from the bottom of the channel,
push into the post until it clicks into place. (Fig. 7)
Repeat on second post (Fig. 8)
Insert rst decorative screen panel into assembly
(into post channel). (Fig. 9)
Slide H-Channel in the groove from the top,
resting it on the top of the rst Decorative Screen
Panel. Push down on the rail to conrm post
channel is seated correctly.
Posts are pre-drilled. Using #2 square drive bit
provided, install screw into place, locking post &
rail together. (Fig. 10)
NOTE:
A at head screw driver can be used to fully
seat into post.
6.
Posts are pre-drilled in screw location. Using
the #2 square drive bit provided in the kit, install
screw through this location and lock post and rail
together. Repeat on second post. (Fig. 5A & 5B)
NOTE:
See side view of installation (Fig. 6)
A
DETAIL A
SCALE 1 : 3
CC
D
SECTION C-C
DETAIL D
SCALE 1 : 1
CHANNEL CORRECTLY
INSTALLED INTO POST
FIG 1
F
DETAIL F
SCALE1 : 3
INSTALL BOTTOM "U" CHANNEL INTO POST.
BOTTOM OF CHANNEL SHOULD SIT ON TOP OF 3" SPACER.
INSTALL SCREW THRU HOLE - USING A PHILLIPS BIT INSTALL SCREW THRU RAIL
A
HH
K
K
J
SECTION H-H
DETAIL J
SCALE 1 : 1
RAIL INSTALLED CORRECTLY
FIG 2
M
SECTION K-K
DETAIL M
SCALE 1 : 1.5
U-CHANNEL
3" PVC CHANNEL
SCREW
TYPICAL 1ST STEP ON ALL SCREENS
INSTALL 3" POST CHANNEL INTO POST - SHOULD SIT ON TOP OF THE POST MOUNTING PLATE.
Fig. 5B
Fig. 5A
A
DETAIL A
SCALE 1 : 3
CC
D
SECTION C-C
DETAIL D
SCALE 1 : 1
CHANNEL CORRECTLY
INSTALLED INTO POST
FIG 1
F
DETAIL F
SCALE1 : 3
INSTALL BOTTOM "U" CHANNEL INTO POST.
BOTTOM OF CHANNEL SHOULD SIT ON TOP OF 3" SPACER.
INSTALL SCREW THRU HOLE - USING A PHILLIPS BIT INSTALL SCREW THRU RAIL
A
HH
K
K
J
SECTION H-H
DETAIL J
SCALE 1 : 1
RAIL INSTALLED CORRECTLY
FIG 2
M
SECTION K-K
DETAIL M
SCALE 1 : 1.5
U-CHANNEL
3" PVC CHANNEL
SCREW
TYPICAL 1ST STEP ON ALL SCREENS
INSTALL 3" POST CHANNEL INTO POST - SHOULD SIT ON TOP OF THE POST MOUNTING PLATE.
A
DETAIL A
SCALE 1 : 3
CC
D
SECTION C-C
DETAIL D
SCALE 1 : 1
CHANNEL CORRECTLY
INSTALLED INTO POST
FIG 1
F
DETAIL F
SCALE1 : 3
INSTALL BOTTOM "U" CHANNEL INTO POST.
BOTTOM OF CHANNEL SHOULD SIT ON TOP OF 3" SPACER.
INSTALL SCREW THRU HOLE - USING A PHILLIPS BIT INSTALL SCREW THRU RAIL
A
HH
K
K
J
SECTION H-H
DETAIL J
SCALE 1 : 1
RAIL INSTALLED CORRECTLY
FIG 2
M
SECTION K-K
DETAIL M
SCALE 1 : 1.5
U-CHANNEL
3" PVC CHANNEL
SCREW
TYPICAL 1ST STEP ON ALL SCREENS
INSTALL 3" POST CHANNEL INTO POST - SHOULD SIT ON TOP OF THE POST MOUNTING PLATE.
BT
DETAIL BT
SCALE 1 : 3
BUBU
BV
SECTION BU-BU
DETAIL BV
SCALE 1 : 1
CHANNEL CORRECTLY
INSTALLED INTO POST
FIG 1
BW
DETAIL BW
SCALE1 : 3
INSTALL BOTTOM "U" CHANNEL INTO POST.
BOTTOM OF CHANNEL SHOULD SIT ON TOP OF 3" SPACER.
INSTALL SCREW THRU HOLE - USING A PHILLIPS BIT INSTALL SCREW THRU RAIL
A
BYBY
CB
CB
CA
SECTION BY-BY
DETAIL CA
SCALE 1 : 1
RAIL INSTALLED CORRECTLY
FIG 2
CC
SECTION CB-CB
DETAIL CC
SCALE 1 : 1.5
U-CHANNEL
3" PVC CHANNEL
SCREW
TYPICAL 1ST STEP ON ALL SCREENS
INSTALL 3" POST CHANNEL INTO POST - SHOULD SIT ON TOP OF THE POST MOUNTING PLATE.
CD
DETAIL CD
SCALE 1 : 3
CECE
CM
SECTION CE-CE
CG
DETAIL CG
SCALE1 : 3
INSTALL BOTTOM "U" CHANNEL INTO POST.
BOTTOM OF CHANNEL SHOULD SIT ON TOP OF 3" SPACER.
INSTALL SCREW THRU HOLE - USING A PHILLIPS BIT INSTALL SCREW THRU RAIL
CHCH
CK
CK
CJ
SECTION CH-CH
DETAIL CJ
SCALE 1 : 1
RAIL INSTALLED CORRECTLY
FIG 2
CL
SECTION CK-CK
DETAIL CL
SCALE 1 : 1.5
U-CHANNEL
3" PVC CHANNEL
SCREW
DETAIL CM
SCALE 1 : 1
CHANNEL CORRECTLY
INSTALLED INTO POST
TYPICAL 1ST STEP ON ALL SCREENS
INSTALL 3" POST CHANNEL INTO POST - SHOULD SIT ON TOP OF THE POST MOUNTING PLATE.
FIG 1
CD
DETAIL CD
SCALE 1 : 3
CECE
CM
SECTION CE-CE
CG
DETAIL CG
SCALE1 : 3
INSTALL BOTTOM "U" CHANNEL INTO POST.
BOTTOM OF CHANNEL SHOULD SIT ON TOP OF 3" SPACER.
INSTALL SCREW THRU HOLE - USING A PHILLIPS BIT INSTALL SCREW THRU RAIL
CHCH
CK
CK
CJ
SECTION CH-CH
DETAIL CJ
SCALE 1 : 1
RAIL INSTALLED CORRECTLY
FIG 2
CL
SECTION CK-CK
DETAIL CL
SCALE 1 : 1.5
U-CHANNEL
3" PVC CHANNEL
SCREW
DETAIL CM
SCALE 1 : 1
CHANNEL CORRECTLY
INSTALLED INTO POST
TYPICAL 1ST STEP ON ALL SCREENS
INSTALL 3" POST CHANNEL INTO POST - SHOULD SIT ON TOP OF THE POST MOUNTING PLATE.
FIG 1
BT
DETAIL BT
SCALE 1 : 3
BUBU
BV
SECTION BU-BU
DETAIL BV
SCALE 1 : 1
CHANNEL CORRECTLY
INSTALLED INTO POST
FIG 1
BW
DETAIL BW
SCALE1 : 3
INSTALL BOTTOM "U" CHANNEL INTO POST.
BOTTOM OF CHANNEL SHOULD SIT ON TOP OF 3" SPACER.
INSTALL SCREW THRU HOLE - USING A PHILLIPS BIT INSTALL SCREW THRU RAIL
A
BYBY
CB
CB
CA
SECTION BY-BY
DETAIL CA
SCALE 1 : 1
RAIL INSTALLED CORRECTLY
FIG 2
CC
SECTION CB-CB
DETAIL CC
SCALE 1 : 1.5
U-CHANNEL
3" PVC CHANNEL
SCREW
TYPICAL 1ST STEP ON ALL SCREENS
INSTALL 3" POST CHANNEL INTO POST - SHOULD SIT ON TOP OF THE POST MOUNTING PLATE.
Predrill - LinePredrill - Line
Predrill - CornerPredrill - Corner
Predrill - EndPredrill - End
Predrill - EndPredrill - End
Predrill - LinePredrill - Line
Predrill - CornerPredrill - Corner
Fig. 6
BN
DETAIL BN
SCALE 1 : 5
BP
BP
BR
SECTION BP-BP
DETAIL BR
SCALE 1 : 2.5
INSTALL THE PVC INSERT.
INSERT CHANNEL AT AN ANGLE AS SHOWN BELOW.
WORKING FROM THE BOTTOM OF THE CHANNEL PUSH THE SIDES INTO THE POST UNTIL IT CLICKS IN PLACE.
USING A FLAT HEAD SCREW DRIVER ON THE INSIDE SURFACE WILL HELP WITH THE INSTALL.
SEE FIG1 FOR PROPER INSTALLATION
AA
CV
A
UU
W
W
V
SECTION U-U
Y
SECTION W-W
DETAIL AA
INSTALL 33" PVC CHANNEL INTO POST. ENSURE
CHANNELS ARE INSTALLED CORRECTLY (SEE FIG1).
33" PVC CHANNEL
DETAIL CV
SCALE 1 : 4.5
REPEAT STEPS ON SECOND POST.
Fig. 7
Fig. 8
AA
CV
A
UU
W
W
V
SECTION U-U
Y
SECTION W-W
DETAIL AA
INSTALL 33" PVC CHANNEL INTO POST. ENSURE
CHANNELS ARE INSTALLED CORRECTLY (SEE FIG1).
33" PVC CHANNEL
DETAIL CV
SCALE 1 : 4.5
REPEAT STEPS ON SECOND POST.