EasyManua.ls Logo

Barton RCL-6002 - Maintenance

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
The following is a checklist of the areas of the READY CARE LIFT that should be
inspected on a regular basis. It is recommended to inspect the lift monthly or bi-monthly.
This will depend on frequency of use. Any part which appears worn or wearing should be
replaced immediately for safety of caregiver and patient.
DATE
CARRIER SECTION
HEAD PROTECTORS __________
ROTATION OF CARRIER SECTION __________
SLING HOLDER __________
HANGER SHAFT (CHECK FOR WEAR) __________
MAIN PIVOT BOLT AND BUSHING (CHECK FOR WEAR) __________
RAISING ARM
PIVOT BOLT __________
HANDGRIPS __________
HANGER /SCALE PIVOT BOLT __________
ELECTRIC ASSEMBLY
RAISES AND LOWERS SMOOTHLY __________
HAND CONTROL __________
BATTERIES __________
WEIGHT TESTED TO __________
UNDERCARRIAGE
LEG LOCKING BOLTS __________
LEG WIDENING ASSEMBLY __________
LEG WIDENING ARMS __________
CASTORS __________
PAINT & CHROME __________
BELTS OR SLINGS VISUAL __________
ALL MOVING PARTS (I.E. BOLTS AND METAL BUSHINGS) SHOULD BE
LUBRICATED AT LEAST EVERY SIX MONTHS WITH LITHIUM GREASE.
MAINTENANCE
29

Related product manuals