Do you have a question about the Baxi Bermuda BBU 15 HE and is the answer not in the manual?
Output | 15 kW |
---|---|
ErP Space Heating Efficiency Class | A |
Fuel Type | Natural Gas |
NOx Class | 5 |
Weight | 32 kg |
Mounting | Wall-mounted |
CH Output (kW) | 15 |
Efficiency | 90% |
Provides general advice on handling the boiler and safety responsibilities.
Details pre-handling steps including coordination and route planning.
Explains proper lifting and handling techniques to prevent injury.
Covers safety regulations and guidance for tasks performed at height.
Describes the boiler's purpose, type, output, and compatibility.
Lists items included in the boiler and flue packs.
Identifies key components of the boiler using a labelled diagram.
Provides detailed specifications and performance data for the boiler model.
Outlines requirements and conditions for water circulation systems.
Details system flushing and inhibitor requirements to prevent corrosion.
Specifies pipework guidelines and recommendations for system connections.
Describes necessary system control components like timers and thermostats.
Provides guidance for installations using fully pumped open vent systems.
Advises consulting manufacturers for storage system integration.
Details requirements for sealed central heating systems, including pressure relief.
Specifies dimensions and conditions for the installation opening.
Defines acceptable locations for boiler installation, excluding bathrooms.
Details requirements for fireplace openings and surrounds.
Explains the use of extension kits for firefront fitting.
Provides guidelines for flue installation, height, and positioning.
States no specific ventilation is required for the boiler room.
Details gas supply installation requirements, pipework, and routing.
Outlines electrical connection standards and safety notes.
Specifies general requirements for condensate discharge pipework.
Explains the condensate disposal system and routing options.
Condensate pump function, safety features, and sump volume.
Provides a detailed wiring diagram of the boiler's internal components.
Outlines initial steps before installing the boiler and flue.
Details requirements and steps for installing the flue system.
Instructions for lifting, positioning, and securing the boiler.
Connecting flow and return water pipes correctly.
Requirements for connecting the gas supply pipe.
Electrical connection requirements and safety warnings.
Connecting the plug and wiring to the boiler.
Final sealing and connecting the boiler control.
Steps for commissioning the boiler after installation.
Recommends annual servicing and outlines checks for safety and performance.
Detailed steps for inspecting boiler components during annual servicing.
General advice before changing any boiler components.
Instructions for removing and replacing the spark generator.
Instructions for removing and replacing the electrode assembly.
Instructions for removing and replacing the condensate pump.
Instructions for removing and replacing the fan assembly.
Instructions for removing and replacing the burner.
Instructions for removing and replacing the injector.
Instructions for replacing the gas valve, including CO2 adjustment.
Instructions for replacing the Printed Circuit Board (PCB).
Instructions for replacing the NTC temperature sensor.
Instructions for replacing the safety thermostat.
Instructions for removing and replacing the float switches.
Procedure for setting the gas valve and checking CO2 levels.
Lists basic checks to perform when troubleshooting boiler issues.
Explains common error codes displayed by the boiler.
Troubleshooting flowchart based on operational sequences.
Specific fault-finding steps for various error conditions.
Detailed fault-finding steps for additional error conditions.