Do you have a question about the Baxi Bermuda VP3 and is the answer not in the manual?
Specifies relevant British and Irish codes and regulations for safe gas installation.
Details requirements for competent installers and the 'Benchmark' service log book.
Covers safe installation, mandatory earthing, and immediate actions for gas leaks.
Recommends annual servicing, prohibits operation with faults, and stresses electrical safety.
Steps to prepare the unit for operation, including closing the fire and turning off the boiler thermostat.
Detailed procedure for lighting the boiler pilot light using manual or electronic controls.
Instructions on how to light the main boiler burner after the pilot light is established.
Guidance on adjusting the boiler thermostat for optimal temperature settings.
Procedure for resetting the boiler, especially when the lockout light is illuminated.
Instructions for lighting the fire pilot, adjusting the fire, and turning the fire off.
Steps for shutting down the boiler for short or long periods, including electrical isolation.
Information on safety guards and critical warnings about the hot glass front panel.
Specifies minimum clearance dimensions required around the appliance for safe operation.
Instructions for cleaning the fire's metalwork, glass, and the fuel effect coal bed.
Explains the function of the pilot light as an ASD and the importance of regular servicing.
Procedure for safely removing the glass front panel, with warnings about its heat resistance.
Step-by-step guide for replacing the fire's internal illumination bulbs, including electrical isolation.
Instructions on how to light the fire pilot using a match in the event of an electricity interruption.
Details the 3-year guarantee on the Baxi Bermuda and the conditions for repairs or replacements.
Urges users to return the reply-paid guarantee registration to maximise benefits.