EasyManua.ls Logo

Baxi COMBI 424 - Recommendations; The Benchmark Scheme; Benchmark Commissioning Checklist; Liabilities

Baxi COMBI 424
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1.2 Recommendations
Caution
Only qualified professionals are authorised to work on the boiler
and the installation.
The appliance has an integral frost protection mode as long as
there is power to the boiler.
Important
Regularly check the water pressure in the system (recommen
ded pressure is 1.5 bar).
Keep the appliance accessible at all times.
Do not remove or cover the user information and serial number
labels affixed to the boiler control flap. They must remain legible
throughout the lifetime of the boiler.
1.2.1
The Benchmark Scheme
Baxi Heating UK Ltd is a licensed member of the Benchmark Scheme
which aims to improve the standards of installation and commissioning of
domestic heating and hot water systems in the UK and to encourage regu
lar servicing to optimise safety, efficiency and performance.
Benchmark is managed and promoted by Heating and Hotwater Industry
Council. For more information visit www.centralheating.co.uk
1.2.2
Benchmark Commissioning Checklist
Please ensure that the installer has fully completed the Benchmark Check
list on the inside back pages of the installation instructions supplied with
the product and that you have signed it to say that you have received a full
and clear explanation of its operation. The installer is legally required to
complete a commissioning checklist as a means of complying with the ap
propriate Building Regulations (England and Wales).
All installations must be notified, by the installer, to Local Area Building
Control either directly or through a Competent Persons Scheme. A Build
ing Regulations Compliance Certificate will then be issued to the customer
who should, on receipt, write the Notification Number on the Benchmark
Checklist.
This product should be serviced annually to optimise its safety, efficiency
and performance. The service engineer should complete the relevant sec
tion of the Benchmark Service Record in the Installation & Service manual
after each service.
The completed Benchmark Checklist & proof of annual servicing (where
applicable) will be required in the event of any warranty work.
1.3
Liabilities
1.3.1 User's liability
To guarantee optimum operation of the system, you must abide by the fol
lowing instructions:
Read and follow the instructions given in the manuals provided with the
appliance.
Call on a qualified professional to carry out installation and initial com
missioning.
Get your installer to explain your installation to you.
Have the required inspections and maintenance carried out by a quali
fied installer.
Keep the instruction manuals in good condition close to the appliance.
1 Safety
6 7672032 - 1 - 03112016

Table of Contents

Other manuals for Baxi COMBI 424

Related product manuals